References

13. April 2021

Installation of lamps

13. April 2021

Underfloor heating

13. April 2021

Water and gas connection

13. April 2021

Boiler assembly

13. April 2021

Boiler assembly 02

13. April 2021

Installation of electrical infrared panels

13. April 2021

Bathroom assembly

13. April 2021

Modernization of the Fire Department in the village of Trnovec nad Váhom 18.11.2020

13. April 2021

Construction of bridge no. 3584-001 in front of the village Krušinec